1. Project
is a plan that is bound by the three major components: budget, time, and
resources.
2. Projects
are goal oriented. A project is designed and launched in order to utilize
available resources properly and achieve the designed goals.
3. The
plans and projects are different according to their bases and criteria. They
can be categorized into following major types:
a. Based
on location: local, districts, provincial, national and international
b. Based
on time: Short term project, long term project.
c. Based
on fund: Big project, small project.
4. There
are 455 projects running in Nepal, among them 21 projects are regarded as national
pride and these are enlisted in national priority projects.
Projects
of National Pride of Nepal:
1. Sikta
Irrigation Project
2. Babai
Irrigation Project
3. Bheri
Babai Diversion Multi -Purpose Project
4. Ranijamara
Kulariya Irrigation Project
5. Budhi
Gandaki Hydro Project
6. Upper
Tamakoshi Hydro Project
7. West
Seti Hydro Project
8. Kathmandu
– Terai Fast Track
9. North-South
Karnali Highway
10. North-
South Kaligandaki Highway
11. North
– South Koshi Highway
12. Pushpalal
Mid-Hill Highway
Upper
Tamakoshi Hydro Project
a. The
main objective of this project is to reduce the load-shedding problem from the
country.
b. The
construction site is in Lamabagar VDC of Dolakha on the Tamakoshi River.
c. When
this project is accomplished, it will be the largest hydro power project in
Nepal.
d. This
project is completely financed by the domestic financial institutions and
companies.
e. 456
MW electricity is expected to be generated from this project.
f. This
project was started in 2063 B.S. (2008) and expected to be accomplished by 2072
B.S. (2016) but due to earthquake and economic blockade its deadline is getting
postponed.
Budhi
Gandaki Hydro Project
a. The
main objective of this project is to solve the chronic problem of power
shortage in the country.
b. The
development site is along the border of Dhading and Gorkha districts.
c. This
is reservoir type of hydropower and the capacity is 1200 MW.
d. The
reservoir of the project will be 48 km long and 263 m high and will spread over
an area of 63sq. km.
e. The
water pooled in this huge reserve capacity pond can be used to generate
electricity during dry seasons.
f. The
estimated cost to reach over Rs. 205 billion.
g. The
funding of this project is made by various financial institutions such as the
World Bank, ADB, international financial agencies.
h. This
project will be very important to transform the whole country.
i. This
project has been expected to be accomplished by 8 years from its initiation.
President
Chure Conservation Programme
a. The
main objective of this project is to protect the lower hilly region from
denudation and landslide at the chure area.
b. The
series of low hills steeply rising from the Terai plain to its north from Ilam
in the east to Kanchanpur in the west is known as Chure or Siwalik at the
altitude from 200-2100 m from the sea level.
c. This
range is extensively covered with dense sub-tropical forest.
d. The
geological structure of this low land is fragile as it is made of loose sandy
gravel soil.
e. Chure
range covers about 12.7870 of the total area or Nepal and 60% of the total
population of the country.
f. Because
of high population pressure this region is being heavily destroyed.
g. This
region is considered vulnerable to natural disasters such as landslides, soil
erosions, flood and climate change impacts.
h. Mining
and excavation of construction materials such as sand, pebbles etc. from the
base of these hills and rivers have threatened the sustainability of the whole
area.
i. In
order to solve this problem, government of Nepal has launched the President
Chure Conservation Programme and enlisted into the national priority project.
j. The
main objective of this project is to conserve the forest area.
k. The
program was first launched in F/Y 2067/2068 and declared a national pride
project in F/Y 2070 / 71.
Pushpalal
(Mid-Hill) Highway
a. In
order to uplift the socio-economic development of hilly and mountain regions,
government started the construction of highway parallel to Mahendra hghway.
b. This
project was launched in F/Y 2064/65 with the domestic funding of Nepal.
c. The
eastern point of highway begins from Chiyo Bhanjyang of Panchthar and the
western point is Jhulaghat of Baitadi.
d. The
highway connects 215 villages of 23 districts of hilly region.
e. Government
has planned to establish 10 model cities, estimating to reduce the migration
form hill to terai, along the highway: Phidim (Panchthar) Basantapur
(Terhathum), Khurkot (Sindhuli), Galchi-Bairani (Dhading), Dumre Bhansar
(Tanahun), Burtibang (Baglung), Rakam Karnali (Dailekh), Sanfebagar (Achham),
and Patan (Baitadi).
f. The
project provides market for agricultural, mineral and forest products of hills
and mountain.
g. The
estimated cost of the project is 3337 Crore rupees.
h. The
construction of the project is expected to be completed by the end of F/Y 2074
/ 75. About 99 % of the budget and construction has met the target.
Melamchi
Drinking Water Project
a. This
is the project which is supposed to bring water from the Melamchi river of
Sindhupalchok district situated to the north of Kathmandu by laying down 27.
5km pipeline through the tunnel to Kathmandu.
b. This
project aims to distribute 17 crore litre of water daily in Kathmandu valley.
c. After
completion of the project, it fulfils the chronic scarcity of drinking water in
the Kathmandu Valley.
d. This
project was previously expected to finish up to 2016 but due to earthquake and
border obstacle it could not complete in time.
Very
Short Answer Question
1. Name
any two national pride projects of Nepal declared in 2017.
Ans:
Any two national pride projects of Nepal declared in 2017 are:
a. Pokhara
International Airport
b. Mid-Hill
Highway (Pushpalal Highway)
2. How
do the national pride projects contribute in the national development?
Ans:
The national pride projects are of nationally prioritized projects declared by
the government which benefits the whole country’s population uplifting
economic, social and political status as well as utilizing the local resources.
3. What
is the meaning of development project? Write in a sentence.
Ans-
Development project is a planned -activities carried out for development of
certain area or country as a whole.
4. How
many model cities are going to be developed along the Mid-Hill Highway?
Ans-
There are ten model cities that are going to b3e developed along the Mid-Hill
Highway. Two of them are:
a. Basantapur
b. Sanfebagar
5. What
would be the role of Pokhara International Airport in the national development
process? Write in a sentence.
Ans-
It will help to increase an easy international access to Nepal and help to
develop tourism industry of Nepal.
6. What
kind of projects are necessary for the development of our country? Write in two
points.
Ans-
The projects necessary for the development of our country are:
a. Agricultural
projects are necessary for reducing the unemployment rates.
b. Educational
and skill training projects are also necessary for the youths in order to
increase the capability.
7. What
is meant by national pride project?
Ans-
The development project work which significantly influences the national
development is known as national pride project.
8. What
types of development project is needed to solve the problem of your locality?
Ans-
My locality has high prospective of fisheries, so development project on modern
techniques of keeping fishes is needed to open the door of economic prosperity
of my locality.
9. What
are the infrastructures of development projects? List them.
Ans-
There can be several infrastructures of projects. Some of them are listed
below:
a. Technical
Human Resources
b. Capital
c. Natural
Resources
d. Local
Participation
10. What
role should local government play to complete mid-hill highway in scheduled
time? Write in a sentence.
Ans-
The local people should actively supervise the construction sites to complete
the project in time.
11. What
should be done for the success of project of national pride? Write in a point.
Ans-
For the success of project of national pride all citizens and government should
take initiation to launch them from their side financially, physically and
morally.